Integrated Waste-to-Energy Pilot Plant (750 KW)

Project Overview

Client’s Need: BPPT required an integrated pilot plant to demonstrate thermal technology for municipal waste processing with simultaneous power generation, serving as a research model and scalable solution for urban waste management in Indonesia.

Our Solution: Indomarine delivered complete EPC services for an advanced waste-to-energy facility featuring an 8 TPH membrane wall boiler, 750 KW power generation system, waste processing unit, and sophisticated emissions control systems.

The Outcome: Successful demonstration of integrated waste-to-energy technology that processes municipal waste while generating electricity, providing valuable data and a scalable model for sustainable urban waste management solutions nationwide.

Technical Highlight

  • Boiler Capacity: 8 TPH membrane wall boiler

  • Power Output: 750 KW

  • Waste Capacity:

  • Technology: Advanced thermal processing

  • Emission Control: Comprehensive APC system

  • Scope: Full EPC turnkey project

Waste-to-Energy Pilot Plant - BPPT, 2018

Info Project

Project

Our Legacy of Success

Discover our completed projects across Indonesia, delivering excellence in boiler solutions, precision manufacturing, plant maintenance, and machinery installation.

Ready to Power Your Project?

Discuss your requirements with our experts and discover how our integrated divisions can provide the perfect solution for you.